Navisworks Manage من شركة Autodesk
اداة رائعة تشهل استيراد النماذج و المقارنة بينهم و حل التعارض و توليد تقارير بصفة تلقائية
Manage provides facility to import models from wide range of file formats, to
perform clash detection and to generate reports in multiple formats (html,
xml, viewpoints) as desired.
Model-based Clash Detection between
trades www.autodesk.com
————————–
ProjectWise Navigator من شركة Bentley
Clash Detection ProjectWise creates a seamless foundation environment for all
Bentley
applications to extend interoperability.
Coordination between models and
disciplines www.bentley.com
——————————
Digital Project Designer من Gehry Technologies
Model Coordination Full range of capabilities, from takeoff to estimating, to scheduling and project
management
Full featured suite, based upon CATIA
application http://www.gehrytechnologies.com
Solibri Model Checker Solibri Spatial Coordination
Model Checker is a true BIM application focused on the Information
associated with model objects and their compliance with established rules or
standards.
QA/QC of models based upon rulesets and
spatial requirements www.solibri.com
———————-
Synchro Professional من Synchro Ltd.
Planning & Scheduling
BIM for Delivery from concept to commissioning (versus BIM for
Design or Facilities Operations); Integrated and collaborative
3d model based scheduling, budgeting/cost and supply chain
management.
Schedule-driven site coordination www.synchroltd.com
—————————–
Tekla Structures Tekla Construction
Management
Tekla Structures for construction management is an information
model-based software solution that supports contractors, sub-contractors,
and project management professionals by helping them to centralize and
visualize project data.
Structures is a very broad BIM offering from
a structure-centric perspective
———————————–
Vico Office من Vico
يجمع بين Revit, Tekla,
Multiple function
Vico Office allows GCs to combine BIMs from Revit, Tekla,
ArchiCAD, CAD-Duct, and IFC files. The “whole model” (whatever its level of
detail) can then be coordinated, scheduled and estimated
As the level of detail increases,
the schedule and estimate become more
precise.
Filed under: BIM, bim management